NHAT TAN BRIDGE TO NOI BAI AIRPORT CONNECTING ROAD CONSTRUCTION PROJECT

 

Nhat Tan bridge to Noi Bai airport connecting road construction project is under the project chain of Nhat Tan Bridge, T2 terminal construction project – Noi Bai airport plays particularly important role in the implementation of socio-economic development strategy phase 2011-2020, breakthrough in capital infrastructure. When completed, the above project chain will form the completed transportation system connecting Hanoi center with Noi Bai airport, shorten the travel time from the center to Noi Bai international airport; connecting satellite towns, facilitating socio-economic development, cultural  development and tourism of the capital.

      Main Project Feature:

      The project has total investment cost of about 4,900 billion VND, PMU85 (MOT) is representative of client, and the project is funded by       ODA of Japanese Government and domestic counterpart fund. Total length of the road is 12,1km; starting point is at Nam Hong                 intersection; ending point is at NH2 and North Thang Long – Noi Bai road intersection. The scope is main urban road, design speed is         80km/h, and cross section is from 80 to 100m. There are 8 permanent bridges, prestressed RC structure and 8 intersections.

Country:

Viet Nam

Client:

PMU85

Contract period:

2010 – 2010

Scope of work:

Detailed design for section from Km 6+100 to ending point of the project.

 

X